Datenerfassung Kontakt
Zurück
Industry News      2026年02月27日
Headline: Solving the "Double-Feeding" Bottleneck in Automated Screw Feeding

In high-speed production, "Double-Feeding"—where two screws jam the system simultaneously—is a leading cause of unplanned downtime.


What causes this? 

 Signal Lag: If the inlet sensor fails to detect a screw in time, the cutting mechanism may release a second screw into the tube. 

 Reset Errors: If a technician resets the PLC after a jam without running a "Clearance Program," the residual screw collides with the new one, causing an immediate secondary jam.


Our 3-Tier Prevention Strategy: 

Logic-First: Implement strict "Screw Memory" and automated tube-clearing logic post-reset. 

Mechanical Precision: Optimize sensor positioning and cutting stroke to ensure physical single-screw isolation. 

Signal Integrity: Enhance sensor filtering to eliminate interference, ensuring every signal is a true detection.


By stabilizing the feeding pulse, we keep your OEE high and your downtime low. 


#AutomationEngineering #ScrewFeeding #ManufacturingEfficiency #QualityControl #Leetx #IndustrialAutomation #SmartAssembly




Verwandte Nachrichten
2026 03 04
Why Tightening Sequence is the "Hidden DNA" of Automotive Quality
2026 02 25
Beyond Individual Machines: Integrated Assembly for NEV Core Components.
Lösungsberatung anfordern
Unser Team wird innerhalb von 24 Stunden antworten.
Technik/F&E
Beschaffung
Produktion/Betrieb
Vertrieb/Marketing
Kauf/Verkauf
Support/Service
Partnerschaft/Kanal
Servopresse
Anziehen
Automatische Schraubenzuführung